One map: the autonomy ladder, the lifecycle and the factory stations
The one map combines three axes in a single grid. Maturity is the autonomy ladder, Level 0 to Level 5, measured per loop. Process is the six lifecycle stages, from plan to maintain. Capability is the six factory stations, from intent to release. Each cell names the evidence a loop must produce before it may run at that level.
Your adoption roadmap says “wave 3”, the CTO scorecard says “Level 2”, a vendor deck says “around L3”, and the compound engineering guide says “stage 2”. Then the board asks: what level are we at? Four numbers, four definitions, and none says which work may merge without a human reading it. This page reconciles them: one vocabulary for maturity, process and capability, and a map from every older scheme on this site back to it.
What the one map settles for each reader
Section titled “What the one map settles for each reader”- Developers: which evidence your loop has to produce before you stop reading its diffs, stage by stage.
- Tech leads: a loop register you can copy, and a rule for promoting or demoting a loop on evidence rather than on confidence.
- CTOs: a metric definition for team and organization level that cannot be averaged into a vanity number, and risk classes that sit beside levels instead of inside them.
- Executives: one sentence to report upward (“share of merged change produced at Level 4 or above, with its failure rate”) and the list of outside models that are not the same thing.
What are the three axes of the one map?
Section titled “What are the three axes of the one map?”Each axis answers a different question with a different unit, and confusing the units starts most maturity arguments.
| Axis | Question it answers | Values | Unit it applies to | Canonical page |
|---|---|---|---|---|
| Maturity | Who reads what before a change merges? | L0 By hand · L1 Assisted · L2 Paired · L3 Review manager · L4 Spec manager · L5 Dark factory | One loop | The autonomy ladder |
| Process | Where in the life of a change are we? | Plan · design · build · test · deploy · maintain | One stage of the lifecycle | The AI-native lifecycle |
| Capability | What machinery exists to run that stage without a person? | Intent · harness · loop · graph · verification · release | One station of the factory | Level 5: the six stations |
A loop is a repeatable class of change with its own trigger, oracle and stop condition: dependency bumps, flaky-test repair, feature work in the checkout service, schema migrations. A level belongs to a loop, not to a company: a dependency-bump loop with a deterministic check can run at Level 4 while the feature work beside it sits at Level 2, and both answers are correct at once.
The ladder’s six levels follow Dan Shapiro, “The Five Levels: from Spicy Autocomplete to the Dark Factory” (January 2026); the short names are this site’s. Shapiro places most AI-native developers at Level 2 and says almost everyone tops out at Level 3, which is why most cells in the grid below sit in those two columns for most teams.
Where do the nine task nodes fit?
Section titled “Where do the nine task nodes fit?”The tool trees (Claude Code, Codex, Cursor) are organized by nine task nodes. They are navigation, not a fourth axis, and each one maps onto the process and capability axes:
| Task node in the tool trees | Lifecycle stage | Stations it mostly documents |
|---|---|---|
| Quick start | Setup, before the lifecycle | Intent, harness |
| Plan | Plan, design | Intent |
| Build | Build | Harness, loop, graph |
| Test | Test | Verification |
| Ship | Deploy | Verification, release |
| Operate | Maintain | Loop, release |
| Automate | Build to maintain | Loop, graph, release |
| Team | Across stages (shared rules and people) | Intent |
| Reference | None | None |
The grid: what evidence does each level require at each stage?
Section titled “The grid: what evidence does each level require at each stage?”Rows are lifecycle stages; each row names the stations that produce its evidence. Columns are ladder levels. A cell is the evidence that must exist, and be produced by a machine wherever the level is L4 or above, before a loop may claim that level at that stage. L0 and L1 are left out: at those levels the evidence is the human who typed or accepted each line.
| Stage (stations) | L2 Paired | L3 Review manager | L4 Spec manager | L5 Dark factory |
|---|---|---|---|---|
| Plan (intent) | Intent lives in the prompt and the developer’s head | A written task with acceptance criteria in the issue | A committed intent.md or spec with machine-checkable acceptance criteria, accepted by a named owner before the run | Intents arrive from a queue (tracker, alert, incident), each carrying its own oracle; the owner signs the intent, not the code |
| Design (intent, graph) | Decided live in the session | A plan reviewed in plan mode before implementation starts | Committed spec.md and plan.md; architecture constraints encoded as rules or fitness functions the agent cannot edit | Decomposition runs as a versioned workflow; a design change outside the agreed envelope escalates to a human |
| Build (harness, loop, graph) | The human watches every edit and answers permission prompts | The agent runs unattended in a worktree or sandbox; the evidence is the diff plus a local test run | An explicit permission mode and sandbox for the run type, a stop condition a machine evaluates, and a retry bound | Event-triggered runs with no approval prompts; the harness configuration is versioned and reviewed like code |
| Test (verification) | Tests the human writes or reads | CI is green and a human reads the diff, tests included | An oracle outside the agent’s reach (protected tests, acceptance tests from the spec) and an evidence bundle attached to the pull request | Oracle strength is measured, not assumed; CI rounds are bounded; the factory itself has evals |
| Deploy (verification, release) | The human merges what they wrote with the agent | A human approves the merge after reading every diff | The merge decision rests on the evidence bundle and the risk class; code is read only for the classes that require it | Low-risk classes auto-merge by rule; progressive delivery with automatic rollback on a service-level breach |
| Maintain (loop, release) | Humans watch production | The agent triages on request; a human drives the fix | Scheduled or event-triggered runs open pull requests from alerts, with runtime signals in the evidence | A breached control band writes the next intent, and every incident adds a case to the oracle |
Read the grid by row, not by column. A loop is at the lowest level any of its stages supports. A loop with an L4 test row and an L3 deploy row is an L3 loop, because a human still reads every diff before merge.
The canonical pages for the cells are evidence instead of diffs (what a human reads at L4), the evidence bundle (what the pull request must carry), oracle strength (how strong the test row is) and progressive delivery (the L5 deploy row).
How do you score a team or an organization?
Section titled “How do you score a team or an organization?”A team does not have a level. It has a distribution: the share of its merged change produced by loops at each level. Use this definition as it stands.
| Field | Definition |
|---|---|
| Unit | One merged pull request (or merged change set), tagged with the loop that produced it |
| Level of a change | The level the loop held on the merge date, established by the evidence test in the next section, not by self-report |
| Window | A rolling 30 days for teams; a quarter for the organization |
| Team level | Share of merged changes at L0–L2, L3, L4 and L5 in the window |
| Organization level | The same distribution across all teams, plus the number of loops at L4 or above |
| Paired stability measure | Change failure rate (or revert rate) per level, in the same window |
| Forbidden | Averaging levels into one number (“Level 3.4”), or reporting the best loop as the team’s level |
The paired stability measure is not optional. DORA’s 2025 report (Nathen Harvey and Derek DeBellis, Google Cloud, 23 September 2025) found “a positive relationship between AI adoption on both software delivery throughput and product performance”, and in the same breath: “However, AI adoption does continue to have a negative relationship with software delivery stability.” A distribution that moves right while failures rise is not progress.
An illustrative team, not a measured one:
| Loop | Level | Merged PRs, 30 days | Share |
|---|---|---|---|
| Dependency bumps | L4 | 60 | 30% |
| Flaky-test repair | L4 | 20 | 10% |
| Checkout feature work | L3 | 84 | 42% |
| Schema migrations (critical class, always read) | L3 | 12 | 6% |
| Payment-provider integration | L2 | 24 | 12% |
The report line is: “Checkout: 40% of merged change at L4, 48% at L3, 12% at L2, with change failure rate per level beside it.” The team is not “Level 3”. It runs two L4 loops, and the next promotion decision is about one named loop, not the team.
Run the distribution from your merged pull requests
Section titled “Run the distribution from your merged pull requests”Export the last 30 days of merged pull requests with the GitHub CLI, in your terminal, from the repository root:
# GNU date (Linux); on macOS use: date -v-30d +%FSINCE=$(date -d '30 days ago' +%F)gh pr list --state merged --search "merged:>=$SINCE" --limit 1000 \ --json number,title,labels,author,headRefName,files,commits,reviews,mergedBy,mergedAt,body > merged-prs.json
# Slim the export: the raw file is one JSON line, often several MB, which a# file-reading tool cannot page through.jq '[.[] | {number,title,labels:[.labels[].name],author:.author.login,branch:.headRefName, files:[.files[].path],commits:[.commits[]|{headline:.messageHeadline,body:.messageBody, authors:[.authors[]|{login,name}]}],reviews:[.reviews[]|{author:.author.login,state}], mergedBy:.mergedBy.login,body}]' merged-prs.json > prs-slim.jsonSave the prompt below as prompts/level-distribution.txt, then run it read-only in your tool. --tools "Read" removes every other Claude Code tool; in Codex, the :read-only permission profile (beta) replaces the legacy --sandbox flag, and the two must not be combined:
claude -p "$(cat prompts/level-distribution.txt)" --tools "Read" > level-distribution.mdcodex exec -c default_permissions=":read-only" -o level-distribution.md "$(cat prompts/level-distribution.txt)"Open the agent chat in the repository, attach prs-slim.json and paste the prompt. The task needs no terminal commands and no edits, so decline any the agent proposes, then save the answer as level-distribution.md.
Why is a risk class not a maturity level?
Section titled “Why is a risk class not a maturity level?”A level describes a loop. A risk class describes a single change. They answer different questions, and mixing them produces the worst failure on this page: “we are Level 4, so the agent may merge the auth change”.
| Risk class | Typical changes | May merge on evidence alone? | Who signs |
|---|---|---|---|
| Low | Docs, copy, internal tooling, patch-level dependency bumps with green contract tests | Yes, in L4 loops; by rule in L5 loops | The loop owner, through the rule |
| Medium | Feature logic behind a flag, internal API changes | Yes, when a human reads the evidence bundle | A reviewer of the evidence |
| High | Public API contracts, data model changes, performance-critical paths, any change to tests or CI configuration | No: evidence plus a human reading the sensitive paths | The code owner |
| Critical | Authentication, money movement, schema migrations on production data, secrets and permissions, the agent’s own harness | No: a human reads the code, and deployment needs a separate approval | A named owner and a second approver |
The class caps what a level may do with a given change. An L5 loop that opens a critical-class pull request escalates it exactly as an L2 team would. Changes to tests and CI are high class on purpose: they are the oracle, and an agent that edits its own oracle has turned the check into a suggestion. The policy that assigns classes lives in governance and autonomy; the list of changes where someone still reads code lives in evidence instead of diffs.
How do you prove a loop is at the level you claim?
Section titled “How do you prove a loop is at the level you claim?”A level is a claim about evidence, so it can be checked without reading the code. Run this audit before promoting a loop and once a quarter after.
- Sample. Pick 10 merged pull requests from the loop at random from the last window.
- Check the evidence for the claimed level. For L3, each has a human approval after a diff review. For L4, each carries an evidence bundle, its tests and CI files are untouched (or code-owner approved), and the run recorded a stop condition. For L5, each merged by rule with no human approval, and the rollback path has fired at least once in a drill.
- Check the four ledger questions from software factories: what oracle decides done, can the agent fake it, how long until a wrong answer surfaces, and what the blast radius is.
- Compare stability. The loop’s change failure rate or revert rate over the window must be no worse than at its previous level.
- Record the verdict in the loop register with the date and the sample, and have the tech lead sign the promotion.
A failed check demotes the loop; it does not start a debate. The tech lead signs promotions, and the CTO owns the risk-class policy.
The artifact that makes this repeatable is a loop register, one file per repository:
# loops.yaml: one entry per repeatable class of change- loop: dependency-bumps owner: platform-team trigger: Renovate pull request opened stages: [build, test, deploy] level: L4 oracle: required CI jobs defined outside the paths the agent may write agent_can_edit_oracle: false time_to_surface_wrong_answer: minutes in CI, hours in canary blast_radius: one service, reversible by revert merge_on_evidence: [low] escalate_to_code_reading: [high, critical] last_audit: 2026-09-26, 10 of 10 PRs carried an evidence bundle next_transition: to: L5 exit_criterion: auto-merge for the low class with canary rollback, 60 days without a loop-caused revert- loop: checkout-feature-work owner: checkout-team trigger: ticket moved to Ready with acceptance criteria stages: [plan, design, build, test, deploy] level: L3 oracle: unit and integration tests in the same repository (agent-editable) agent_can_edit_oracle: true merge_on_evidence: [] next_transition: to: L4 exit_criterion: acceptance tests generated from the spec and protected by CODEOWNERS; evidence bundle required by CIWhich older schemes does the one map replace?
Section titled “Which older schemes does the one map replace?”This site used to run several numbering schemes side by side. They are retired, and each maps back to one axis of the map. If you meet one in an older bookmark or an internal deck, translate it with this table.
| Retired scheme | What it described | What replaces it | Where to read it now |
|---|---|---|---|
| Waves 0–5 | A repository rollout in fixed waves | Ladder transitions, one loop at a time | Adoption roadmap |
| Weeks 1–8, “Month 2+” | A developer’s learning calendar | Track steps with exit criteria | Developer track |
| Weeks 1–12, “Month 4+”, “Phased Enterprise Rollout” | An organization rollout calendar | Stop/go gates stated as ladder transitions per loop | Transformation roadmap |
| Adoption Curve, Phase 0, org-size models | Who adopts first, and in what order | Ladder transitions plus a designed pilot | Pilot design |
| Phases 1–4 | A tool migration checklist | Unnumbered migration steps | Migration guide |
| “Tier 2 / Tier 3” | Parallel agents, then overnight runs | L3 (parallel agents, a human reads every diff) and L4–L5 (unattended runs) | Team parallelism |
| “Reactive → Strategic Leader” | Leadership maturity labels | The Level 1–4 bands the CTO scorecard scores: Assisted, Paired, Review manager, Spec manager | CTO scorecard guide |
| Every’s stage ladder (stages 0 to 5), used as a second ladder | An individual’s adoption path | The ladder, per loop; Every’s stages remain Every’s own model (see below) | Compound engineering |
| “Risk tiers 0–3” | How dangerous a change is | Risk classes: low, medium, high, critical | Governance and autonomy |
The CTO scorecard band is a self-assessment of practices (tooling, review, governance), not the level distribution of merged change. Never report it as “our level”; quote it separately from the distribution.
The pattern behind the table: a date is not evidence, and a measure of danger is not a measure of maturity.
Where the one map goes wrong
Section titled “Where the one map goes wrong”Averaging levels into one number. “The org is at Level 3.2” hides the two loops that could run dark and the critical loop that should never have left L3. Recovery: report the distribution and the count of loops at L4 or above, never a mean.
Scoring the team by its showcase loop. One polished dependency-bump loop at L4 becomes “we are an L4 team”. Recovery: the team level is the share of merged change, so a loop that produces 5% of merges moves the distribution by 5%.
Reading a risk class as permission. A loop promoted to L4 starts merging schema migrations on evidence alone. Recovery: classes cap levels; add the critical paths to CODEOWNERS and make CI fail when an evidence-only merge touches them.
Claiming a level the stations cannot support. A loop is called L4 while its oracle sits in the same diff the agent writes. Recovery: run the audit above; a loop whose agent can edit its oracle is L3 until the oracle moves out of reach.
Moving right while getting worse. The share at L4 rises and so does the revert rate. Recovery: demote the loop that caused the reverts, fix its oracle, and re-audit before promoting it again.
Where to go next from the one map
Section titled “Where to go next from the one map”Frequently asked questions
What is the one map?
A single grid with three axes. Maturity is the autonomy ladder, Level 0 to Level 5, measured per loop. Process is the six lifecycle stages, plan, design, build, test, deploy and maintain. Capability is the six factory stations, intent, harness, loop, graph, verification and release. Each cell names the evidence a loop must produce before it runs at that level.
What level is my team or organization at?
Not one level. A team's level is the distribution of its merged changes across the levels of the loops that produced them, for example 40% at Level 4, 48% at Level 3 and 12% at Level 2 over 30 days. An organization is the same distribution across all its teams, reported beside a stability measure for each level.
Is a risk class the same as a maturity level?
No. A risk class (low, medium, high, critical) is a property of one change, such as a schema migration or a copy edit. A level is a property of a loop. A Level 5 loop still escalates a critical change to a human who reads the code, and a Level 2 team still has low-risk changes.
Are JetBrains AIDEs, Every's stage ladder and the DORA AI Capabilities Model the same as the ladder?